ALENTEJO · ALGARVE

Solar panel installation in Alentejo and the Algarve

Your solar installation should match how you use electricity. We assess the site, consumption patterns and electrical system before proposing a photovoltaic solution.

BEFORE CHOOSING EQUIPMENT

How many solar panels do you actually need?

A monthly bill is a starting point, but it does not show when you use energy. An evening-occupied home and a daytime business use solar production differently. We compare hourly demand, expected generation and surplus before selecting system size.

What we assess

Energy use and generation

Review bills, tariffs and operating hours. Separate total solar generation from the electricity that can actually be used at the property.

Roof or land

Assess orientation, shading, available space, access and mounting conditions. Suitability depends on the site visit and assessment.

Electrical installation

Review the distribution board, connection, protection, cable routes and inverter compatibility. A price per panel does not cover all of these considerations.

COST AND SCOPE

What determines the quotation?

The quotation depends on system size, inverter, mounting, access, cable distances, protection and required works. It should specify equipment, installation, transport, applicable procedures, taxes, timescales and warranty terms. Final pricing follows assessment.

Tell us about your project →
PREPARE YOUR ENQUIRY

Start with what you already have.

Questions before you invest

Do photovoltaic panels also heat water?

Photovoltaic panels generate electricity. They can power electric water-heating equipment, but differ from solar thermal collectors. Tell us whether you need electricity, hot water or both.

Do I need a battery from the start?

Not necessarily. We compare systems with and without storage using your daytime demand, surplus production, evening use and the additional investment.

Can I request a business quotation?

Yes. For industry, agriculture and tourism we also consider shifts, seasonality, peaks and operating requirements. See our commercial solar service for more detail.

How long does installation take?

Timing depends on the assessment, equipment, works and applicable procedures. The proposal should set out the expected schedule once the site requirements are understood.

Solar panel installation

Let us assess your project.

Tell us the location, whether this is a home or business, and your main objective. A site visit allows us to check the installation requirements.

Submitting an enquiry does not commit you to a purchase. Any assessment or installation costs will be set out in the proposal.

+351 964 188 899
REQUEST AN ASSESSMENT

Request an assessment

Marked fields are required so we can reply.